Main » Energy Solutions » Renewable Energy » Biogas » Biogas to Electricity
FJP 5.5MW Biogas Power Plant, Jerantut, Pahang
Biogas to electricity is at the heart of Cenergi’s renewable energy efforts, enabling a cleaner and more resilient energy future for Malaysia.
With over 30 biogas plants across Malaysia and Lampung, Indonesia, we’ve built one of Southeast Asia’s largest biogas portfolios, generating a total of 52.8 MW. These plants capture methane from palm oil mill effluent (POME) — a major industry by-product — and convert it into electricity for the national grid.
This process not only prevents harmful methane emissions and water pollution but also promotes sustainable palm oil practices. Our biogas projects bring lasting local benefits by creating jobs, supporting technical skills development, and boosting rural economies.
At Cenergi, biogas is more than renewable energy — it’s a way to transform waste into lasting value for communities and the environment.
If you believe that we can make a difference together, we look forward to hearing from you. Contact us here
Higher alkalinity results
Longer wastewater retention time
Lower energy requirements
Lower maintenance costs
Lower methane emissions
Higher biogas yield
Up to 90% COD removal efficiency
Strong project portfolio comprises of well-run operational projects and promising pipeline